Yas Riva Reserve, Abu Dhabi
01 / The project
A closer look.
Manarat Living III is the final phase of Aldar’s Manarat Living collection in Saadiyat Cultural District. Studios and one- to three-bedroom apartments are paired with shared creative spaces, including a podcast studio, gaming room and rooftop cinema.
The official brochure takes a more expressive approach to shared interiors, with exposed concrete, coloured seating and dedicated spaces for recording, games and work. This is an apartment community within the cultural district, rather than a private beachfront villa development.
A look inside Manarat Living III.



- Release size
- Aldar’s January 2025 announcement describes 400 homes sold in the original release. That historical sales statement does not establish current resale supply.Aldar: 31 January 2025 Manarat Living III sales announcement
- Layout distinctions
- The reviewed drawings separate standard two-bedroom homes from study variants and show different balcony forms. Compare the exact type, floor and registered area before using another apartment as a price benchmark.Manarat Living III floor plans, CASADIOR-linked copy
02 / At a glance
The details.
- Residence type
- Apartment
- Bedrooms
- Studio–3
- Handover
- Q2 2028 · reported estimate
- Developer
- Aldar Properties
Amenities & lifestyle
- Podcast studio
- Gaming room
- Rooftop cinema
- Business centre and library
- Fitness centre
- Swimming pools
- Children’s play space
- Bicycle storage
- Landscaped gardens
Inside the home
Floor plans.
Explore the layouts and room dimensions. Open a floor plan for a closer look.
Confirm the signed plan and layout for the apartment. The original PDF includes building floorplates.
Plan source · page 103 / Planning your purchase
Price & payment plan.
Property Finder’s FAQ records AED 1.05m, while its headline currently shows approximately AED 1.1m. The earlier figure is a launch reference, not a live unit quotation. Aldar announced the original 400-home release sold out in January 2025; any current resale or re-release needs checking.
Property Finder: Manarat Living Phase 3The reported plan is 10% at launch, 55% during construction and 35% on handover. The portal mentions five construction instalments without exposing a complete dated schedule. Confirm the contractual dates and outstanding balance.
- 10%Booking · reported planProperty Finder: Manarat Living Phase 3
- 55%During constructionProperty Finder: Manarat Living Phase 3
- 35%HandoverProperty Finder: Manarat Living Phase 3
Property Finder lists April 2028, within Q2. This remains an estimate; obtain the latest unit-specific developer completion and possession dates before committing.
Property Finder: Manarat Living Phase 304 / The neighbourhood
Location & connectivity.
Saadiyat Cultural District, Saadiyat Island
Near Sheikh Khalifa Bin Zayed Street (E12)

Nearby destinations
Approximate area travel times reported by Bayut
- 3minManarat Al Saadiyat
- 5minLouvre Abu Dhabi
- 8minSaadiyat Beach
Aldar places the third phase in the Cultural District. Bayut’s nearby travel estimates vary by route and traffic. Check directions for current access.
05 / Look closer
Project resources.
06 / Further reading



