All Imtiaz Developments projects

Imtiaz Developments/Project information

Wynwood Horizon by Imtiaz

Meydan Horizon, Dubai

Wynwood Horizon by Imtiaz image gallery

01 / 42 The proposed complete tower and podium

01 / The project

A closer look.

Wynwood Horizon is a lagoon-facing apartment development in Meydan Horizon. Its podium brings together residences, retail and leisure spaces, with larger homes on the upper floors.

Retail occupies the lower levels. The building pack distinguishes ordinary three-bedroom homes from upper-level penthouses.

A look inside Wynwood Horizon by Imtiaz.

Wynwood Horizon official project render of the proposed home living room and kitchen.
The proposed home living room and kitchen
Wynwood Horizon original brochure render of the proposed home bathroom.
The proposed home bathroom
Wynwood Horizon: developer project and FAQWynwood Horizon: branded37-page brochure, broker-hostedWynwood Horizon: branded23-page building plans, broker-hosted
Building levels
Ground, four podiums, 18 residential floors and roof, per building pack.Wynwood Horizon: branded23-page building plans, broker-hosted
Fit-out
Custom kitchens, appliances and smart controls; confirm furniture inventory separately.Wynwood Horizon: developer project and FAQ
Website snapshot
14% overall; 92% substructure; 1% superstructure; MEP and finishing 0%. Undated.Wynwood Horizon: developer project and FAQ

02 / At a glance

The details.

Residence type
Apartment
Bedrooms
1–3
Handover
May 2028
Wynwood Horizon: developer project and FAQWynwood Horizon: branded23-page building plans, broker-hosted

Unit sizes & layouts

Residence layouts and floor areas. See the linked plans for each configuration.
LayoutPublished area
1BR: portal guide700–755 ft²Property Finder: Wynwood Horizon unit catalogue
2BR: portal guide1,211–1,437 ft²Property Finder: Wynwood Horizon unit catalogue
3BR: portal guide1,840–2,003 ft²Property Finder: Wynwood Horizon unit catalogue

Amenities & lifestyle

  • Adult and children’s pools
  • Clubhouse
  • Gym
  • Outdoor cinema
  • Barbecue area
  • EV charging
  • Landscaped courtyard
  • Sunken seating
  • Children’s zone
Wynwood Horizon: developer project and FAQ

Inside the home

Floor plans.

Explore the layouts and room dimensions. Open a floor plan for a closer look.

Open floor plan PDF

Twenty-two complete building sheets cover ground, four podiums, floor 1 with amenities, residential levels through floor 18 and a separate penthouse roof portion. Three separately attributed broker images add 1 BR layouts. These sheets state no numerical individual saleable areas. The roof portion does not establish a separate whole-home total. Confirm the exact selected unit, area and final revision with Imtiaz.

Plan source · page 2

Ground · retail and arrival

Open PDF

Use original size for small labels. Scroll or swipe across the enlarged sheet.

03 / Planning your purchase

Price & payment plan.

Enquire for pricingPrice on request
Payment plan60/40 published reference

The developer publishes no starting price here. Property Finder’s AED 1,800,209 launch reference is not current inventory; its developer release is marked sold out.

Wynwood Horizon: developer project and FAQ

Published reference: 20% booking, 40% instalments and 40% completion. Confirm the selected unit’s calendar and eligibility.

  1. 20%Booking referenceWynwood Horizon: developer project and FAQ
  2. 40%Construction instalmentsWynwood Horizon: developer project and FAQ
  3. 40%Completion target: May 2028Wynwood Horizon: developer project and FAQ
Wynwood Horizon: developer project and FAQ

04 / The neighbourhood

Location & connectivity.

Meydan Horizon, Dubai

Meydan Horizon · wider connections through Dubai–Al Ain Road and Al Khail Road

Get directions
Complete original Wynwood Horizon location map.
Wynwood Horizon setting · complete original brochure map, Reelly broker-platform mirror.

The original maps place the project within Meydan Horizon and show Downtown Dubai, Dubai Design District, Ras Al Khor’s sanctuary and Dubai International Airport in the wider context. They give no numerical journey schedule. Separate time cards are omitted. Project-name directions remain available. The marked future metro retains proposed scope.

Location source

05 / Look closer

Project resources.

06 / Further reading

Project sources.