City Walk, Dubai
01 / The project
A closer look.
Bluewaters Bay is a waterfront apartment development between Bluewaters Island and The Beach at JBR. The official collection extends from one-bedroom homes to five-bedroom penthouses. Tower 1 plans distinguish ordinary balcony apartments, promenade-level terraces and split-level penthouse layouts.
Tower 1’s promenade Type 01A has a larger terrace than the regular version. The five-bedroom penthouse spans two levels; its repeated whole-home table is not a separate area for each floor.
A look inside Bluewaters Bay.



02 / At a glance
The details.
- Residence type
- Apartment
- Bedrooms
- 1–5
- Developer
- Meraas
Unit sizes & layouts
| Layout | Published area |
|---|---|
| Tower 1 · 1-bedroom Type 01A · regular exampleP 205 | 798.04 sq ft total: 722.15 suite + 75.89 balconyBluewaters Bay own Tower 1 plans |
| Tower 1 · 2-bedroom Type 02 · illustrated regular units | 1,309.86 sq ft total: 1,173.70 suite + 136.16 balconyBluewaters Bay own Tower 1 plans |
| Tower 1 · 5-bedroom duplex penthouse · units 4605/4805 | 6,878.46 sq ft whole-home total: 5,608.10 suite + 1,270.36 balconyBluewaters Bay own Tower 1 plans |
Amenities & lifestyle
- Infinity pool
- Fitness centre
- Tennis court
- Double-height arrival lobby
Inside the home
Floor plans.
Explore the layouts and room dimensions. Open a floor plan for a closer look.
798.04–799.54 sq ft total area
The areas follow the source tables for each tower. Each penthouse level displays its unit’s combined total. The Tower 2 drawings come from an attributed broker mirror.
Plan source · page 303 / Planning your purchase
Price & payment plan.
The sold-out Meraas page retains AED 2.85m. Its original sheet lists one-bedroom homes from 2.85m, two from 4.42m and three from 6.61m. These are historical developer guides, not a current quotation or evidence of stock.
Meraas: Bluewaters Bay own project pageBluewaters Bay original official prices and dated planThe original official plan gives 20% booking; 10% June 2023; 10% December 2023; 10% June 2024; 10% December 2024; 10% June 2025; 10% December 2025; 20% July 2027 handover. Past milestones require reconciliation with any remaining transfer balance.
- 20%Booking · original calendarBluewaters Bay original official prices and dated plan
- 10%June 2023Bluewaters Bay original official prices and dated plan
- 10%December 2023Bluewaters Bay original official prices and dated plan
- 10%June 2024Bluewaters Bay original official prices and dated plan
- 10%December 2024Bluewaters Bay original official prices and dated plan
- 10%June 2025Bluewaters Bay original official prices and dated plan
- 10%December 2025Bluewaters Bay original official prices and dated plan
- 20%July 2027 · original handoverBluewaters Bay original official prices and dated plan
The original sheet estimates July 2027. A later Meraas announcement dated 27 January 2025 instead targets Q4 2027, while Property Finder lists March 2027. These are different dated references; obtain the selected unit’s updated contractual date.
Bluewaters Bay original official prices and dated planProperty Finder: Bluewaters Bay timing referenceMeraas27January2025 Bluewaters Bay contract update04 / The neighbourhood
Location & connectivity.
Bluewaters Bay, off Jumeirah Beach Residence, Dubai
By the Bluewaters Island causeway, with connections to Sheikh Zayed Road

Nearby destinations
Approximate travel times from Bluewaters Bay, off Jumeirah Beach Residence, Dubai
- 5minAin Dubai on foot
- 10minJumeirah Beach Residence on foot
- 10minPalm Jumeirah by car
- 15minDowntown Dubai by car
- 30minDubai International Airport by car
These are developer estimates. Walking access and drive times vary with the route and conditions.
05 / Look closer
Project resources.
06 / Further reading
Project sources.
- DeveloperMeraas: Bluewaters Bay own project page
- Official documentBluewaters Bay own official brochure
- Official documentBluewaters Bay own Tower 1 plans
- Official documentBluewaters Bay original official prices and dated plan
- Property portalProperty Finder: Bluewaters Bay timing reference
- DeveloperMeraas27January2025 Bluewaters Bay contract update